CLEM7 will connect Bowen Hills in the north to Woolloongabba in the south

Facts and figures

Tunnel

Length 4.8 kilometre twin, two-lane tunnels
Rock to be excavated 3.5 million tonnes
Tunnel lining segments 38,000
Concrete

280,000 cubic metres

Tunnel Boring Machines

Cost A$50 million per machine
Diameter 12.4 metres
Length 253 metres
Weight 4,000 tonne
Cutters 78 tungsten carbide tipped 19 inch disc cutters
Manufacturer Herrenknecht (Germany)
Progress Up to 20 metres per day
Crew 22 people per shift

Bridges

Number of bridges 18
Number of beams 350 Super T bridge beams
Length of beams 25 kilometres if placed end-to-end
Number of decks 1,100
Biggest beam 39 metres long and weighs 75 tonne

 

 